Cheltenham's Outdoor Heated Swimming Resort
New Additions 2005 - 2006
In addition to our regular maintenance and repairs, here is a list of what we've been up to since closing for the winter.
Small Pool
- We have fully repainted the small pool and elephant pool
Site
- Replacement of guttering to main entrance block and front of cafe
- Installation of new car park machines
- All drainage gullies repainted
- Site furniture stained
Cafe
- Cafe floor repaired
- Cafe doors replaced with original 1935 design
Behind the scenes
- New main pool heat plate exchanger in plant room
- Repair to boiler, heating both pools
- Replacement of water tanks and related pipework in mens changing facility